Shopping Cart
no products

pipe Fittings

pipe Fittings
  

Page: [<<]   1  2  3  4  5  6  [>>] 

screw S

screw S

screw S

for pipes according to EN 10357 - is supplied in individual parts
ID: inside diameter pipe

310,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

screw S

screw S

screw S

for pipes according to EN 10357 - is supplied in individual parts
ID: inside diameter pipe

317,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

screw S

screw S

screw S

for pipes according to EN 10357 - is supplied in individual parts
ID: inside diameter pipe

241,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

screw S

screw S

screw S

for pipes according to EN 10357 - is supplied in individual parts
ID: inside diameter pipe

244,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Locknut F DIN

Locknut F DIN

Locknut F DIN

Rd: round thread - on request with APZ 3.1 / AD2000-W2

544,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Locknut F DIN

Locknut F DIN

Locknut F DIN

Rd: round thread - on request with APZ 3.1 / AD2000-W2

555,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Locknut F DIN

Locknut F DIN

Locknut F DIN

Rd: round thread - on request with APZ 3.1 / AD2000-W2

720,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Locknut F DIN

Locknut F DIN

Locknut F DIN

Rd: round thread - on request with APZ 3.1 / AD2000-W2

731,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Locknut F ISO

Locknut F ISO

Locknut F ISO

Rd: round thread - on request with APZ 3.1 / AD2000-W2

217,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Locknut F ISO

Locknut F ISO

Locknut F ISO

Rd: round thread - on request with APZ 3.1 / AD2000-W2

217,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

blind mother

blind mother

blind mother

Rd: round thread

703,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

blind mother

blind mother

blind mother

Rd: round thread

717,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

blind mother

blind mother

blind mother

Rd: round thread

993,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

blind mother

blind mother

blind mother

Rd: round thread

1.007,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Screw-connection cone

Screw-connection cone

Screw-connection cone

G: Pipe thread ISO 228-1 - SW: spanner

287,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Screw-connection cone

Screw-connection cone

Screw-connection cone

G: Pipe thread ISO 228-1 - SW: spanner

292,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Screw-threaded connector

Screw-threaded connector

Screw-threaded connector

G: Pipe thread ISO 228-1 - SW: spanner - Rd: round thread

255,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Screw-threaded connector

Screw-threaded connector

Screw-threaded connector

G: Pipe thread ISO 228-1 - SW: spanner - Rd: round thread

259,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Blind clamping adapter (TC)

Blind clamping adapter (TC)

Blind clamping adapter (TC)

Available in AISI 316L-1.4404

265,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Blind clamping adapter (TC)

Blind clamping adapter (TC)

Blind clamping adapter (TC)

Available in AISI 316L-1.4404

265,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Clip (easy)

Clip (easy)

Clip (easy)

D: for flange
E: max. operating pressure

279,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Clip (easy)

Clip (easy)

Clip (easy)

D: for flange
E: max. operating pressure

284,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Clip (massive) with wing nut

Clip (massive) with wing nut

Clip (massive) with wing nut

D: for flange
E: max. operating pressure

298,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

Clip (massive) with wing nut

Clip (massive) with wing nut

Clip (massive) with wing nut

D: for flange
E: max. operating pressure

304,00 EUR
plus 19% tax excl. Shipping costs

Shippingtime: ca. 4 weeks ca. 4 weeks (abroad may vary)

  

Page: [<<]   1  2  3  4  5  6  [>>] 

Show 73 to 96 (from a total of 130 products)
Shopsoftware by Gambio.de © 2012