Your shopping cart

The products marked ***, are not in stock in the quantity you requested.
The quantity entered will be supplied by us very soon. We can do a part delivery on request.



  Product Number Unit price Total
Red Tee SSS short (old series) Red Tee SSS short (old series)***
Shippingtime: ca. 4 weeks
  Update  Delete 201,00 EUR 201,00 EUR
Connector DIN GK Connector DIN GK***
Shippingtime: ca. 4 weeks
  Update  Delete 262,00 EUR 262,00 EUR
Tee CCC Tee CCC***
Shippingtime: ca. 4 weeks
  Update  Delete 233,00 EUR 233,00 EUR
Plate check valve ZF (DIN) Plate check valve ZF (DIN)***
Shippingtime: ca. 4 weeks
  Update  Delete 2.090,00 EUR 2.090,00 EUR
Weld-on vacuum valve F Weld-on vacuum valve F***
Shippingtime: ca. 4 weeks
  Update  Delete 267,00 EUR 267,00 EUR
Cap nut DN 150 Cap nut DN 150***
Shippingtime: <1 week
  Update  Delete 217,25 EUR 217,25 EUR
blind mother blind mother***
Shippingtime: ca. 4 weeks
  Update  Delete 417,00 EUR 417,00 EUR
Red Tee DIN 11852-TS Red Tee DIN 11852-TS***
Shippingtime: ca. 4 weeks
  Update  Delete 231,00 EUR 231,00 EUR
Plate check valve GS (DIN) Plate check valve GS (DIN)***
Shippingtime: ca. 4 weeks
  Update  Delete 529,00 EUR 529,00 EUR
Safety valve with pneumatic lifting KG Safety valve with pneumatic lifting KG***
Shippingtime: ca. 4 weeks
  Update  Delete 1.703,00 EUR 1.703,00 EUR
Plate check valve ZF (DIN) Plate check valve ZF (DIN)***
Shippingtime: ca. 4 weeks
  Update  Delete 2.140,00 EUR 4.280,00 EUR
Plate Heat Exchanger 9 hl/h Plate Heat Exchanger 9 hl/h***
Shippingtime: <1 week
  Update  Delete 1.419,33 EUR 1.419,33 EUR
Arch KK DIN 45 ° Arch KK DIN 45 °***
Shippingtime: ca. 4 weeks
  Update  Delete 206,00 EUR 412,00 EUR
Safety valve with pneumatic lifting KG Safety valve with pneumatic lifting KG***
Shippingtime: ca. 4 weeks
  Update  Delete 1.754,00 EUR 1.754,00 EUR
Safety valve with pneumatic lifting KG Safety valve with pneumatic lifting KG***
Shippingtime: ca. 4 weeks
  Update  Delete 1.296,00 EUR 1.296,00 EUR
Throttle valve KG (DIN) Throttle valve KG (DIN)***
Shippingtime: ca. 4 weeks
  Update  Delete 278,00 EUR 278,00 EUR
Throttle valve KG (DIN) Throttle valve KG (DIN)***
Shippingtime: ca. 4 weeks
  Update  Delete 515,00 EUR 515,00 EUR
Spill angle valve GG spring loaded Spill angle valve GG spring loaded***
Shippingtime: ca. 4 weeks
  Update  Delete 786,00 EUR 786,00 EUR
Screw Press EN250 Screw Press EN250***
Shippingtime: ca. 4 weeks
  Update  Delete 21.000,00 EUR 21.000,00 EUR
Locknut F DIN Locknut F DIN***
Shippingtime: ca. 4 weeks
  Update  Delete 731,00 EUR 731,00 EUR
Safety valve with pneumatic lifting KG Safety valve with pneumatic lifting KG***
Shippingtime: ca. 4 weeks
  Update  Delete 3.667,00 EUR 3.667,00 EUR
Welding arc DIN 11852-BL 90 ° Welding arc DIN 11852-BL 90 °***
Shippingtime: ca. 4 weeks
  Update  Delete 206,00 EUR 206,00 EUR
Ice bank TYPE VAG-R 07 A Ice bank TYPE VAG-R 07 A***
Shippingtime: ca. 4 weeks
  Update  Delete 0,00 EUR 0,00 EUR
Plate check valve ZF (inches) Plate check valve ZF (inches)***
Shippingtime: ca. 4 weeks
  Update  Delete 346,00 EUR 346,00 EUR
Reducer DIN KG concentrically Reducer DIN KG concentrically***
Shippingtime: ca. 4 weeks
  Update  Delete 228,00 EUR 228,00 EUR
Arch KG DN 90 ° Arch KG DN 90 °***
Shippingtime: ca. 4 weeks
  Update  Delete 216,00 EUR 216,00 EUR
Fermentation tank with conical bottom 2000 l Fermentation tank with conical bottom 2000 l***
Shippingtime: ca. 4 weeks
  Update  Delete 3.170,00 EUR 3.170,00 EUR
Calculating shipping costs:

170 kg

German Post

Shipping costs: 117,00 EUR
Subtotal: 46.454,58 EUR
excl. 19% tax: 8.826,37 EUR
Total: 55.280,95 EUR
excl. 117,00 EUR Shipping costs

Here you will find information about Index (center).
Shopsoftware by Gambio.de © 2012